Hose Replacement for Altera Infrastructure
|
Delivery: TESS mechanics installed 380 hoses on cranes that were pre-produced. The hoses were ordered directly from the hose registry in THM, and the registry will be updated after demobilization.
|
| Customer: Altera Infrastructure |
| Location: Randgrid FSO |
| Number of TESS Mechanics: 2 |
| Duration: August 2023 (21 days) |
Foto: Altera Infrastructure

